(2002/07/17) The SIP School Sub-committee met this afternon to receive reports from the Architect and studied the Feasibility Report.
(2002/04/25) 10th Meeting of the Works Sub-committee was again held in the GP Room. Members studied the proposals made by the Architects, Engineers and the QSs. After looking at Plan D closely, floor by floor and after much discussion and sharing of opinions, members agreed on Plan D. Plan D was made up of two blocks, one over the current tennis court and the other along La Salle Road, i.e. at both ends of the Swimming Pool. The two blocks would be connected by a link bridge over the Spectator Stand.
| |||||
| |||||
|
(2002/04/15) 9th Meeting of the Works Sub-committee was held in a General Purpose Room as the Old Boys Room was used as the temporary office by the QAI team. Members received reports from the consultants and discuss on the design of the annex building. Plan A, link bridge along La Salle Road, was way above budget and Plan C was one block without any extension around the Swimming Pool.
| |||||
| |||||
|
(2002/03/23) The SIP table in the Anniversary Dinner
(2002/03/07) The Works Sub-comittee met to discuss with the architects and their teams of consultants and the Quantity Surveyor on the cost estimates.
(2002/02/21) Breaking ground Work began in the Car Park and the entrance to the Car Park and completed on 2002/03/06.
|